| Date | Title |
|---|---|
| 08-04-1994 | Signing of Contract with M/s. Korean Electric Power Corporation (KEPCO) for supply of 100 Te of Heavy Water. |
| 01-12-1991 | Heavy Water Plant, Manuguru was declared commercial. |
| 25-12-1990 | Production of first drop of Heavy Water at Hazira. |
| 17-02-1989 | Renaming of "Heavy Water Projects" as Heavy Water Board". |
| 28-10-1986 | Production of first drop of Heavy Water at Thal. |
| 01-04-1985 | Heavy Water Plant, Kota was declared commercial. |
| 24-10-1984 | Production of first drop of Heavy Water at Talcher. |
| 01-11-1982 | Production of first drop of Heavy water at Kota. |
| 17-08-1978 | Production of first drop of Heavy water at Tuticorin. |
| 04-07-1977 | Production of first drop of Heavy Water at Baroda. |
Last Updated: 06-06-2026