banner

Historical Milestone

Date Title
08-04-1994

Signing of Contract with M/s. Korean Electric Power Corporation (KEPCO) for supply of 100 Te of Heavy Water.

01-12-1991

Heavy Water Plant, Manuguru was declared commercial.

25-12-1990

Production of first drop of Heavy Water at Hazira.

17-02-1989

Renaming of "Heavy Water Projects" as Heavy Water Board".

28-10-1986

Production of first drop of Heavy Water at Thal.

01-04-1985

Heavy Water Plant, Kota was declared commercial.

24-10-1984

Production of first drop of Heavy Water at Talcher.

01-11-1982

Production of first drop of Heavy water at Kota.

17-08-1978

Production of first drop of Heavy water at Tuticorin.

04-07-1977

Production of first drop of Heavy Water at Baroda.

Last Updated: 06-06-2026