01-08-2010

Product withdrawal from CASCADE-3 of Boric acid Enrichment Plant in presence of Dr. Baldev Raj, then Director, IGCAR, & CE, HWB

21-07-2010

Commissioning of Versatile Solvent Synthesis Pilot Plant (VSPP) on D2EHPA [TOPS-99®] mode at HWP, Talcher

01-03-2010

Commissioning of Integrated Effluent Treatment Plant at HWP, Talcher

01-07-2009

Inauguration of Elemental Boron Plant by Dr. Anil Kakodkar, then Chairman, AEC & Secretary, GOI, DAE at HWP, Manuguru

01-07-2009

Inauguration of Boron Enrichment Plant by Dr. S. Banerjee, then Director BARC in presence of Chairman, AEC and CE, HWB at HWP, Manuguru

14-05-2009

Commissioning of Mist Cooling System at HWP, Kota

28-06-2008

Commissioning of Vapor Absorption-Refrigeration System at HWP, Manuguru

01-06-2008

Installation of one additional distillation unit (DU) column taken up to cope up with the enhanced feed processing in XUs at HWP, Manuguru

01-08-2007

H2S gas recovery from sour oil system commissioned at HWP, Manuguru

25-02-2007

First export of Heavy Water for non-nuclear application (to M/s Spectra Gases Inc. USA.)