Annual Contract for overhauling, rewinding and repairing of 415V and 3.3KV motors installed at Heavy Water Plant, Tuticorin.
Maintenance of Street Lights & PTLs in HWP(M) Colony (2023-24)
Laying of 11KV Power cable for colony power supply at HWP(M)
Maintenance / cleaning of Electrical panels , transformer yards at various locations in Main Plant. (Duration of work - 24 months)
Supply of copper links, support structure material as per specification and erection of copper links and free issue material (copper plates, flexible link) with support arrangement with insulation and hook-up with existing bus bar system of 24kA sodium cell at Heavy water board facilities- Vadodara
Last Updated: 25-07-2026