HWP/TAL/ MAINT (E)/ 2022/01
Installation of 15KL underground tank at 132KV switchyard of HWP, Talcher.
Installation of 15KL underground tank at 132KV switchyard of HWP, Talcher.
Contract for "Testing of various protection and auxiliary relays at HWPK during MTA-2022.
Bi Annual Preventive and Breakdown Maintenance of Drinking Water and Sewage Water Pump Sets in HWP(M) colony for the year 2021-23.
Condition monitoring of electrical equipments at Sub-station.
Annual Maintenance of 440/230 Volts Power Distribution System at HWP(M) Colony.
Supply of LED Lamps and replacement of fused lamps at XU-I/II, LPG and Drain pit area
Last Updated: 23-10-2026