HWPM/M-P/102/MTA-2024/03
Maintenance and testing of DD/Gate / check Valves of size 10”NB to 14”NB during MTA-2024 in XU-II of HWPM
Maintenance and testing of DD/Gate / check Valves of size 10”NB to 14”NB during MTA-2024 in XU-II of HWPM
Flange joints maintenance during MTA-2024 at Main Plant of HWP(M)
Exchange unit Towers internal inspection & maintenance works in XU-II during MTA-2024 at Main Plant of HWP (Manuguru)
Miscellaneous Painting Works at HWPM for the year 2024-2025.
Maintenance of Centralised AC System of MCR, Packaged AC Units of Chem. Lab & AHP Control Room, Air Washer Units, AHUs and Deluge system in transformer yards (2Y) at CPP, HWPM
Periodical Cleaning of OHT/ UGT, Oxidation ponds and OHT’s of Residential/ Public buildings at HWPM colony for the years 2024-2026
Laying of PCC along the Perimeter Wall of Plant inside (From Watch Tower-I to Watch Tower-II) at HWP Manuguru. (Phase-I).
Last Updated: 25-07-2026