HWPM/I-P/PPS/CCTV/ANALOG/24/01
Replacement of Analog Cameras with IP based Digital Cameras.
Replacement of Analog Cameras with IP based Digital Cameras.
Two year Annual maintenance contract(AMC) for Eltra make 2(two) nos. of Carbon Analyser
Residual life assessment of Industrial steel structures in CPP at Heavy Water Plant (Manuguru).
Resurfacing of main road in parts from Hospital to High school ground and in other areas of HWPM Colony.
Maintenance of rotating equipments in XU-1& 2, ISG, LPG, SOTP and Drain Pit areas in Main Plant of HWP (M).
Internal Repair & Reconditioning of Exchange Unit Tower (3HT of XU-II) at Main Plant of HWPM
Maintenance of the plants and Lawns in CPP area at HWP Manuguru for the year 2025-2027.
Up keeping and oil handling in SOTP and Exchange unit
Modification of shabari guest house entrance and approaching roads at HWPM colony
Overhauling and running maintenance of Milling System Equipment
Last Updated: 24-10-2026