Development of the plantation in East side E type area of the HWP(M) colony 2019-20.
Repairs to drain header trenches in XU-I at HWP (M).
Construction of Seismic station at HWP(M).
Structural Repairs to Cooling towers and Other areas in CPP at HWPM.
Maintenance of the Plantation in HWP (M) colony 2019-20.
Maintenance of Plants and Lawns in ETP, Boron, Fire water reservoir, N2 Plant and CAP in Main plant at HWP(M) 2019-20.
Annual Contract for assisting the jobs for handling and maintenance of various safety appliances in round the clock shift and in general shift at HWPK.
Excavation of defective underground cable trenches and laying of PVC / XLPE power cables in HWP(M) colony (2019-21)
Last Updated: 27-08-2026