HWPM/CIVIL/MP/NIT/2022/12
Non Destructive Test and Residual life Assessment of RCC structures (Industrial) at HWPM.
Non Destructive Test and Residual life Assessment of RCC structures (Industrial) at HWPM.
Civil works for Elevated Solar Evaporation Pan for SPP at HWP (T).
Facelifting of Plant Entrance Area at HWPM: Phase-I.
Annual Maintenance of Electrical fittings/accessories in street lighting installations, residential quarters and public buildings at Heavy Water Plant (Kota) Colony, Rawatbhata
Laying & termination of 400 Sq mm power cable from MRS to booster area and other various size LT cables and removal of old cables at HWPK
Supply of spare components and Replacement of Damaged Components in Induced Draft Pultruded FRP Counter Flow Cooling Tower at Heavy Water Plant (Kota) site.
Quarterly sampling and analysis of discharge water samples from different locations of Heavy Water Plant and township area by NABL accredited Laboratory for the year 2022-23
Maintenance of the plants and lawns in HWPM colony for the year 2022-2023.
Supply of LED Lamps, LED Flameproof Flood Light Fittings and replacement of fused lamps and existing Flood Light Fittings at XU-I Unit.
Clearing of drain chokes in and around the residential & public buildings at HWPM colony 2022-2023.
Last Updated: 28-08-2026