HWPM/MU/W/BG/2404//R0
Residual life assessment of Industrial steel structures in CPP at Heavy Water Plant (Manuguru).
Maintenance of rotating equipments in XU-1& 2, ISG, LPG, SOTP and Drain Pit areas in Main Plant of HWP (M).
Internal Repair & Reconditioning of Exchange Unit Tower (3HT of XU-II) at Main Plant of HWPM
Last Updated: 05-09-2026