HWPM/E-P/NIT/MTA-24/TOF&MT/24
Transformer oil filtration and Maintenance of Transformers during MTA-24 at HWP(M).
Transformer oil filtration and Maintenance of Transformers during MTA-24 at HWP(M).
HT & LT Electrical Power Panel maintenance during MTA-24 at HWP(M).
Upkeeping activities of production plant like Handling, transferring, charging and dissolution of different chemicals and preparation of chemical solution, chemical decontamination, weighment, packaging, lebeling and storing of products.
Design, Engineering, Supply, Installation, Calibration, Testing, Pre-commissioning, Commissioning of Area Monitoring System for VDPP Project at HWBF-Vadodara
Maintenance and testing of DD/Gate / check Valves of size 1.5”NB, 2”NB to 8”NB during MTA-2024 in XU-II of HWPM
Last Updated: 20-06-2026