HWPM/MU/TG/2306/R1
Online Leak Sealing
Online Leak Sealing
Miscellaneous Painting Works at HWPM for the year 2024-2025.
Maintenance of Centralised AC System of MCR, Packaged AC Units of Chem. Lab & AHP Control Room, Air Washer Units, AHUs and Deluge system in transformer yards (2Y) at CPP, HWPM
Periodical Cleaning of OHT/ UGT, Oxidation ponds and OHT’s of Residential/ Public buildings at HWPM colony for the years 2024-2026
Annual Maintenance Contract (AMC) for the installed water purifiers in HWP (KOTA).
Laying of PCC along the Perimeter Wall of Plant inside (From Watch Tower-I to Watch Tower-II) at HWP Manuguru. (Phase-I).
Last Updated: 19-06-2026