HWPM/MU/W/BG/2610/R0
Insulation Repair Works in Boiler Area at CPP.
Insulation Repair Works in Boiler Area at CPP.
Fabrication works in boiler Auxiliaries at CPP.
“Hydro Testing, Maintenance & Refilling of 6.5 Kg Cap. Carbon Dioxide (CO2) type Fire Extinguisher Cylinders”
Chemical handling and Upkeeping activities of production section.
Quarterly sampling and analysis of discharge water samples from different locations of Heavy Water Plant and Township area by NABL accredited Laboratory for the year 2023-24
Handling, transferring, charging and dissolution of chemicals and preparation of chemical solution, chemical decontamination, weighment and packing and storing of products.
Annual contract of piecemeal Jobs on day to day basis in HWBF Vadodara
Improvement work for entrance hall of Heavy Water Board at 5th Floor, South wing of Vikram Sarabhai Bhavan, Anushaktinagar, Mumbai.
TG-1 (30 MW) Major Overhaul
IBR General Cutting & Welding, Valves replacement etc in MTA 2024