HWPM/MU/TG/W/2201/R1
Replacement of existing damaged base frames of Pumps along with overhauling and Trench Cover structure fabrication and Erection in CPP (RC for 2 years)
Replacement of existing damaged base frames of Pumps along with overhauling and Trench Cover structure fabrication and Erection in CPP (RC for 2 years)
LP Valves Overhauling & Misc.Maint jobs durin MTA-2022
Complete revamping of Cooling tower cell Nos. D and partial revamping of Cell Nos. A,B and C of Main cooling tower in Main plant of Heavy Water Plant (Manuguru)
Miscelleneous Mechanical Maintenance Works of TG Group-CPP (RC for 2 Years)
Maintenance of coal yards and coal feeding in ICHP during 2023-24
Last Updated: 15-06-2026