HWPM/M-P/102/MTA-2020/17
Hydro testing of various pressure vessels including blinding of flanges wherever required and normalising the same after hydro testing during MTA-2020 in Main plant of HWPM
Hydro testing of various pressure vessels including blinding of flanges wherever required and normalising the same after hydro testing during MTA-2020 in Main plant of HWPM
Servicing of hard to operate valves in XU-II during MTA-2020 in Main Plant of HWP (M)
Internal cleaning & Hydrotesting of H2S & LPG storage bullets, PSV's Calibration & Valves maintenance work in Main Plant of HWP (M)
Maintenance and testing of DD/Gate/Check valves of size up to 2" NB to 8" NB during MTA-2020 in XU-II of Main plant of HWPM
Removal and re-erection of Gate valve/Globe valve/Non-return valve/butterfly valve of sizes 2"NB,6"NB & 8"NB during MTA-2020 of XU-II in Main Plant of Heavy Water Plant, Manuguru.