HWBF/TAL/MAINT(E)/2026/02
Operation and maintenance of electrical installations at HWBF, Talcher
Operation and maintenance of electrical installations at HWBF, Talcher
Complete Overhauling work of Vertical Turbine type Pumps, Single & Multi stage centrifugal pumps in RWIT, RWTP, ERPH, DM plant, Filter Water Pump house and ETP area.
Erection & de-erection of temporary platforms work at HWP (Tuticorin).
Erection of approach platform on product storage vessels and erection of transfer and utility pipelines from SPP to product storage vessels at HWPT.
Handling of boron, calcined petroleum coke, boron carbide powder and misc works in boron carbide pelletisation plant.
Supply and Application of cold Insulation( insitu injection method) in main plant, at HWPT.
External Painting Of Residential Quarters, at HWBF, Talcher, Colony For the Year 2026-27.
Up-gradation of Centrailsed Server Room at HWB(C.O.), Mumbai
Removal and refilling of perlite of exchanger 11E1 at HWP, Tuticorin.Removal and refilling of perlite of exchanger 11E1 at HWP, Tuticorin.
Design, engineering, assembling, testing at manufacturer works, safe delivery at site, erection, testing and commissioning at site of 110V DC, 120A float and float cum boost thyristor based 6-pulse battery charger and DCDB at HWBF-Vadodara.
Last Updated: 13-06-2026